欧美aaaav免费大片-欧美aav-欧美ab片-欧美a级黄色片-国产成人涩涩涩视频在线观看-国产成人深夜福利短视频99

Shanghai Industrial Boiler Co., Ltd./Shanghai industrial boiler (Wuxi) Co., Ltd.
Solution·Application area
Glass industry
The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.
    

 

    
Glass kiln waste heat power generation process flow chart

The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.

2018/08/16 14:44:43

15236

Prev Next
×
主站蜘蛛池模板: 爱搞激情在线| 亚洲欧美成aⅴ人在线观看| 房客(糙汉)何璐程曜坤| gogogo高清在线播放| 十七岁高清在线观看| 亚洲欧洲日产国产最新| 欧美黄色影院| 好硬好湿好大再深一点动态图| 在线观看国产| 么公的又大又深又硬想要| 87福利网| 美女的扒开尿口让男人桶动态图| 中文字幕在线视频在线看| 日本中文字幕第一页| 女人与大拘交在线播放| 亚洲国产婷婷综合在线精品| 一本热久久sm色国产| 麻豆国产精品va在线观看不卡| 日本漫画之无翼彩漫大全| 国产对白受不了了中文对白 | 巨大黑人极品hdvideo| 伊人影院综合网| 三级黄色在线观看| 秋霞日韩一区二区三区在线观看| 欧美大香线蕉线伊人久久| 麻豆福利视频| 波多野结衣按摩| 最近手机中文字幕1页| 免费人成在线观看网站| 天天想你电视剧| 领导边摸边吃奶边做爽在线观看| 国产人伦视频在线观看| 亚洲神级电影国语版| 久久精品国产99精品最新| 亚洲剧场午夜在线观看| 在线网站你懂得| 扒开双腿猛进入免费观看美女 | 亚洲高清二区| 国产69精品久久久久777| 男人j进女人p一进一出视频| 亚洲国产毛片|