欧美aaaav免费大片-欧美aav-欧美ab片-欧美a级黄色片-国产成人涩涩涩视频在线观看-国产成人深夜福利短视频99

Shanghai Industrial Boiler Co., Ltd./Shanghai industrial boiler (Wuxi) Co., Ltd.
Solution·Application area
Glass industry
The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.
    

 

    
Glass kiln waste heat power generation process flow chart

The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.

2018/08/16 14:44:43

15236

Prev Next
×
主站蜘蛛池模板: 久久这里只精品99re免费 | 老子影院午夜 | 久久精品国产亚洲7777| 真实国产乱子伦对白视频| 快一点使劲c我在线观看| 国产精品久久久久无码av| 男人边摸边吃奶边做下面| 男按摩师电影| 天天操比| 欧美a级完整在线观看| 美女扒开尿口让男人捅| 日本嫩交| 日本xxxx高清在线观看免费| 欧美国产激情二区三区| 你懂的在线免费观看| 精品无人区一区二区三区| 亚洲精品99久久久久中文字幕| 穿透明白衬衫喷奶水在线播放| 伊在人亚洲香蕉精品区| 美团外卖猛男男同38分钟| 性做久久久久久免费观看| 在线中文字幕不卡| 麻豆国产精品va在线观看不卡| 亚洲国产成人久久综合一区| 久久只这里是精品66| 逼逼日| 美女脱个精光让男人桶爽| 香港黄色碟片黄色碟片| 交换朋友夫妇2| 国产福利在线观看一区二区| 太深了灬太大了灬舒服| 宝贝过来趴好张开腿让我看看| 一级黄影| 久久久噜噜噜久久中文字幕色伊伊| 一区二区三区国产最好的精华液| 连开二个同学嫩苞视频| 免费被靠视频动漫| 国产女人18毛片水真多18精品| 又爽又黄又无遮挡的视频 | 日本成片| 久久久精品免费|