Shanghai Industrial Boiler Co., Ltd./Shanghai industrial boiler (Wuxi) Co., Ltd.
Solution·Application area
Glass industry
The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.
    

 

    
Glass kiln waste heat power generation process flow chart

The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.

2018/08/16 14:44:43

15236

Prev Next
×
主站蜘蛛池模板: 成人免费漫画在线播放| 国产精品久久国产三级国不卡顿 | 欧美一区二区三区久久综合| 亚洲欧洲综合在线| a级毛片免费观看网站| 精品亚洲欧美无人区乱码| 国内精品久久久久久久影视麻豆| 久re这里只有精品最新地址| 日本高清乱理论片| 波多野结衣护士无删减| 国产一区二区在线视频| 日本午夜免费福利视频| 波多野结衣一区二区三区88| 在线中文字幕不卡| 狠狠色噜噜狠狠狠合久| 老女人影院| 国产白丝在线观看| heyzo北条麻妃久久| 久久99精品国产麻豆宅宅| 久久精品人人做人人爽| 国产va免费精品观看精品| 老八吃屎奥利给原视频带声音的| 成人av免费电影| 中文字幕黑人借宿神宫寺| 快点使劲舒服爽视频| 好男人社区神马www在线观看| 久久久噜噜噜久久中文字幕色伊伊| 最近2019中文字幕mv免费看| 国产理论片在线观看| 国产毛片一级| 樱花草在线社区www韩国| 国产护士一级毛片高清| 三级黄色在线观看| 最近最新好看的中文字幕2019| 国内精品久久久久影院一蜜桃| 4444www免费看| 午夜高清视频在线观看| 97就要干| 亚洲国产中文在线视频| 波多野结衣女同| 亚洲国产另类久久久精品小说|