欧美aaaav免费大片-欧美aav-欧美ab片-欧美a级黄色片-国产成人涩涩涩视频在线观看-国产成人深夜福利短视频99

Shanghai Industrial Boiler Co., Ltd./Shanghai industrial boiler (Wuxi) Co., Ltd.
Solution·Application area
Glass industry
The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.
    

 

    
Glass kiln waste heat power generation process flow chart

The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.

2018/08/16 14:44:43

15236

Prev Next
×
主站蜘蛛池模板: 免费看黄a级毛片| 日本肉文| 边吃奶边插下面| 男的把j放进女人下面视频免费| 国产乱视频| 亚洲欧美在线精品一区二区| 免费成人在线电影| 美女被无套进入| 被猛男cao男男粗大视频| 一区二区三区美女视频| 99久久精品费精品国产| 国色天香精品一卡2卡3卡| 男男车车的车车网站免费 | 在线观看国产一区二区三区| 尾野真知子番号| 丁香六月激情综合| 波多野结衣中文字幕一区二区三区| 免费人成年轻人电影| 蜜臀91精品国产高清在线观看| 日韩毛片| 中文字幕久精品免费视频| 四虎成人精品在永久免费| 国产福利电影| 小向美奈子中出播放| 两性高清性色生活片性高清←片| 动漫美女羞羞网站| 日本韩国在线视频| 欧美乱大交| 最近2019免费中文字幕视频三| 国产猛男猛女超爽免费视频| 日本巨黄视频| 蜜柚免费视频下载| 陪读妇乱子伦小说| 国产激情视频一区二区三区| 东北小彬系列chinese| 好吊妞欧美视频免费高清| 国产精品99久久久久久www| 女人与大拘交在线播放| 全彩里番acg海贼王同人本子| 国产60部真实乱| 国产青草视频在线观看|