欧美aaaav免费大片-欧美aav-欧美ab片-欧美a级黄色片-国产成人涩涩涩视频在线观看-国产成人深夜福利短视频99

Shanghai Industrial Boiler Co., Ltd./Shanghai industrial boiler (Wuxi) Co., Ltd.
Solution·Application area
Glass industry
The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.
    

 

    
Glass kiln waste heat power generation process flow chart

The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.

2018/08/16 14:44:43

15236

Prev Next
×
主站蜘蛛池模板: 欧美日韩久久中文字幕| 花传媒季app| 性按摩xxxx| 国产精品久久久久免费视频| 从镜子里看我怎么c你| 欧美三级不卡| 波多野结衣办公室33分钟| 欧美性大战久久久久久久蜜桃| 国产男女无遮挡猛进猛出| 嫩草影院在线免费观看| 国产精品无码久久久久| 高清不卡毛片免费观看| 卡一卡二卡三精品| 国内精品视频一区二区三区八戒| 国产精品9999久久久久仙踪林| аⅴ中文在线天堂| 草莓视频污污在线观看| 欧美乱大交xxxxx另类| 性大毛片视频| 美女张开腿让男人桶爽动漫视频| 国产日韩一区二区三区在线观看| 欧美黑人巨大videos在线| 欧美激情xxxx性bbbb| 日本中文字幕一区二区有码在线| 久久精品中文字幕一区| 黑料不打烊tttzzz网址入口| 羞羞的漫画sss| 与子乱勾搭对白在线观看| 国产剧情麻豆剧果冻传媒视频免费| 亚洲国产另类久久久精品小说| 动漫肉h| 日韩色在线观看| 69国产成人精品午夜福中文| 两根硕大一起挤进小h| 国产va免费精品高清在线| 日本三级电影网址| 午夜电影免费观看| 91热视频在线观看| 国产va免费精品高清在线观看| 成人性生交大片免费看好| 三级免费黄色片|