欧美aaaav免费大片-欧美aav-欧美ab片-欧美a级黄色片-国产成人涩涩涩视频在线观看-国产成人深夜福利短视频99

Shanghai Industrial Boiler Co., Ltd./Shanghai industrial boiler (Wuxi) Co., Ltd.
Solution·Application area
Glass industry
The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.
    

 

    
Glass kiln waste heat power generation process flow chart

The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.

2018/08/16 14:44:43

15236

Prev Next
×
主站蜘蛛池模板: 国产激情一区二区三区| 无翼乌全彩里番蛇姬本子| 国产91在线|欧美| 国产深夜福利在线观看网站| 啊灬啊灬啊灬快好深用力免费| 一个人看的hd免费视频| 伊人色综合网一区二区三区| 再深点灬舒服灬太大了添学长| 亚洲国产日韩欧美一区二区三区 | 免费动漫人物扑克软件网站| 污网站在线免费看| 日韩欧美卡一卡二卡新区| 国产交换配偶在线视频| 国产男男| 两个丫头稚嫩紧窄小说| 午夜爽视频| 夫妇交换性3中文字幕k8| 影音色资源| 亚洲无人区视频大全| 精品国产成a人在线观看| 国产成人精品视频一区二区不卡| 公交车上性配合享受视频| 国产女人18毛片水真多18精品| 亚洲欧美日韩精品久久亚洲区| 爱爱帝国亚洲一区二区三区| 嗯~啊~哦~别~别停~啊老师| 精品三级内地国产在线观看 | 国语一级片| 四虎影视永久在线精品免费| 夜夜操操| 国产精品毛片大码女人| 884aa四虎在线| 中文字幕精品视频在线| 亚洲午夜成激人情在线影院| 亚洲冬月枫中文字幕在线看| 搞逼视频免费看| 中文字幕亚洲综合久久| 国产美女久久精品香蕉69| 日韩aaa电影| 日韩欧美一区黑人vs日本人| a级成人毛片免费视频高清|